Client
LB Redbridge
Duration
20 Weeks
Project Value
£1.15m
Value
£1.15m
Sector
Leisure
This project was to demolish a section of the leisure center that inter-linked the leisure center and the school in preparation for a brand new center to be built in 2023. The Leisure center was adjacent to the occupied school buildings, therefore health & safety were a major factor in relation to the welfare of the pupils and staff while the schools daily operations continued uninterrupted whilst the demolition works took place.